Structure first, then water, then the rest
Get a staged plan
Say whether you already hold a Level 2 report and what it found. We turn the list into stages with prices.
A staged plan
This is how we usually order the work on a Placentia chimney that has failed a Level 2. Your list may be shorter or fall differently, but the logic holds: whatever could fall or burn goes first.
- Stage one, before anyone lights a fire: loose or tipping brick above the roof, split or missing flue tile, a cracked smoke chamber, any gap where heat can reach framing
- Stage two, ahead of the rain: the crown, the cap, the flashing and any leak the inspection traced
- Stage three, as the budget allows: the damper, the firebox face, repointing below the roof, or a gas unit if you are changing fuel
- Optional: bracing or straps on a sound stack, to hold it still in the next shake
Why structure leads
Quake damage sets the order. A stack that has cracked or tipped at the roofline holds its weight over the roof and the side yard, and a split tile lets heat reach the brick and the wood beyond it. Neither waits well. Waterproofing done first on a chimney that later needs rebuilding often gets torn out again.
Once the structure is sound, the rest of the list can follow at a pace that suits the house and the owner. Each stage stands on its own: when it is finished, the chimney is safer or drier than before, even if the next stage is some way off.
What each stage costs
Where an item has a price on our list, it appears below and in your plan. Masonry, crown work, relining, damper and chase cover repairs, and flashing done alone have no set figure; each gets a written scope with its price before that stage is booked.
Staged lists in a sale
When a house is in escrow, stage one is usually what a buyer asks the seller to complete, and the later stages turn into a credit or a line in the disclosures. A plan already split this way makes that conversation shorter.
Prices for common stage items
Most of these items carry a price. The cap is quoted after we measure. Your plan shows which stage each one falls in.
- Camera survey that starts the plan (Level 2)
- $400
- Finding and stopping a roofline leak
- $570 to $3,400
- Cricket to split runoff behind the stack
- $455 to $1,030
- Cricket built in with flashing renewed
- $685 to $1,700
- Gas unit fitted into the old firebox
- $2,850 to $5,700
- New cap over the flue
- Quoted after we measure
Everything else on a staged plan, rebuilds and relining included, is priced on a written scope for that chimney.
Questions about staging
Must stage one happen before I use the fireplace?
Yes. Stage one is made up of the items that make burning unsafe, so the fireplace stays out of use until they are done.
Can stages be combined to save a trip?
Often. If the roof is already open for a rebuild, the cap and flashing can go on in the same visit. The plan notes where combining makes sense.
What if a quake hits between stages?
Let us know through the contact page. We recheck the finished work and the items still waiting, and update the plan.
Is bracing a code requirement?
We present it as an option, not a requirement. It suits a stack that is sound but tall or exposed, where the owner wants it held still in the next shake.
Does the plan change if I switch to gas?
It can. A gas unit set into the existing firebox is vented through its own liner, which can take the place of relining in stage one. Your plan shows both routes.
Turn the repair list into stages
Use the contact page to tell us what the inspection found, or ask us to run one. You get a staged plan with our listed prices and written scopes for the rest.