What a Anaheim visit includes
Plan on camera through the flue, joint by joint, attic framing beside the stack looked at, and roof, crown and flashing checked from the top. Afterwards you receive photos and a short written note on what we saw, what we did and what can wait, whether the job stayed simple or uncovered a repair.

